Evaluation of Transport Roads at PT Aneka Tambang Tbk's Pakal Island Site, East Halmahera Regency, North Maluku Province
DOI:
https://doi.org/10.52046/biosainstek.v8i1.2697Keywords:
Stokpile, AASHTO, Transportation Road, TransportationAbstract
PT. Aneka Tambang Tbk is one of the companies engaged in the laterite nickel mining industry operating in East Halmahera Regency, using the open cut mining method. Based on field observations, during the rainy season, the roads are often slippery and muddy, and the road surface becomes bumpy because hauling activities are carried out even during the rainy season. During the dry season, the roads become dusty, which can interfere with the visibility of transport unit drivers. The road width complies with the American Association of State Highway and Transportation Officials (AASHTO) standard of 12.25 meters. The width of the road is 14.2 meters in segments 1-2, 13 meters in segments 3-4, and 14.3 meters in segments 5-6, which can be safely traversed, while the width of the straight road in segment 7 does not meet AASHTO standards. - Segment 8 is 10 meters wide, so an additional 2.25 meters of road width must be added to ensure safe passage. The transport road width at turns that complies with AASHTO standardization is 26.82 meters. This is found in segments 1 - segment 2, which is 28.3 meters, segments 3 - segment 4, which is 27.6 meters, and segments 5 - segment 6, which is 28 meters, so it can be passed safely.
References
Arif Irwandi, 1998. “Dasar-dasar Perencaan dan Perencangan Tambang” Pusat Pengembangan Tenaga Pertambangan Bandung.
Irwandi Arif, Gatut S. Adisoma 2002. “Perencanaan Tambang” DepartemenTeknik Pertambangan Fakultas Ilmu Kebumian dan teknologiMineral Institut Teknologi Bandung
PrajasumartoPartanto, 1993. “Pemindahan Tanah Mekanis” Jurusan Teknik Pertambangan Institut Teknologi bandung.
sumarto Partanto, 1987 “Tambang Terbuka” Institut Teknologi Bandung Sukiman Silvia, 1999 “Dasar dasar Perencanaan Geometri Jalan” Penerbit Nova, Bandung.
Halid Usman, 2018 “Evaluasi Geometri Jalan Tambang” Program Study Teknik Pertambangan Unvesitas Muhammadiyah Maluku Utara
Rikumahu, M., & Kololu, M. (2023). Evaluasi Teknis Geometri Jalan Angkut Dan Produksi Alat Mekanis Pada Pengupasan Overburden Pit
Angsana Cv. Mitra Anugerah Sejahtera Kabupaten Tanah Bumbu Provinsi Kalimantan Selatan. Jurnal Sosial dan Teknologi Terapan AMATA, 2 (1), 8-20.
Edo Pratama Putra, 2018 “Evaluasi Geometri Jalan Produksi Dari Front Ke Disposal Terhadap Produktifitas Alatangkut Hino 500 Fm” Prodi Teknik Pertambangan Yayasan Muhammad Yamin Sekolah Tinggi Teknologi Industri (Sttind) Padang
Anwar, H., Anshariah, A.S. M., Umar, E. P., Nurwaskito, A., & Adi, S. A. (2020).
Evaluasi Geometri Jalan Angkut Tambang Dari Stockpile Tanjung Gunung Ke Pit Damar Selatan Pada Penambangan Batubara Di Pt Sebuku Iron Lateritic Ores (Silo)Kalimantan Selatan. Jurnal GEOSAPTA Vol, 6
Aldiansyah, Jamal Rauf Husain, Arif Nurwaskito. 2015 “Analisis Geometri Jalan di Tambang Utara pada PT. Ifishdeco Kecamatan Tinanggea Kabupaten Konawe Selatan Provinsi Sulawesi Tenggara”. Jurnal Geomine. 4, 1
August Suryaputra 2009 “Kajian Teknis Produksi Alat Muat Dan Alat Angkut Pada Kegiatan Pengupasan Tanah Penutup Pt. Marunda Grahamineral Di Kecamatan Laung Tuhup, Kabupaten Murung Raya, Kalimantan Tengah” Jurusan Teknik Pertambangan Fakultas Teknologi Mineral Universitas Pembangunan Nasional “Veteran” Yogyakarta.
Downloads
Published
How to Cite
Issue
Section
Citation Check
License
Copyright (c) 2026 Muhammad Djunaidi, Sarna Winsi Harun, Husaen Salahu

This work is licensed under a Creative Commons Attribution 4.0 International License.
ISSN REGISTERED IN : 